Pass 1 โ Vertical Envelope
HEPA-filtered vacuuming of walls, ceiling planes, and crown molding. Captures settled drywall compound and silica fines before wet wiping spreads them.
Post-Construction
Renovation completion is not move-in ready until airborne drywall, silica, and adhesive particulate are physically removed โ not redistributed. Lady Moon deploys true industrial-grade HEPA filtration vacuum networks engineered for post-build environments where consumer equipment fails.

Each pass is logged against room geometry so contractors and homeowners receive predictable, inspectable outcomes.
HEPA-filtered vacuuming of walls, ceiling planes, and crown molding. Captures settled drywall compound and silica fines before wet wiping spreads them.
Light fixture housings, receptacle plates, and HVAC register surrounds are detailed. Fine dust is extracted from edges normal residential vacuums blow back into the room.
Supply and return openings receive focused HEPA passes so your mechanical system does not redistribute renovation dust on first heat cycle.
Scraping paint splatters, protective film adhesives, and drywall mud from newly installed window panes and glass โ optical clarity without scratching.
Send renovation square footage and completion date via WhatsApp or call 705-970-1809. Complex dust jobs clock at $45/hr with transparent on-site caps.